Device | Month.Year | Conpany |
Start of manufacture of automobile fuel hoses and brake hoses. | 1947 | KenitsuFujii established a Fujii brake manufacturing company in Hikari,Yamaguchi Prefecture. |
Start of manufacture of oil-hydraulic high-pressure hoses. | 1955 | The company’s name changed to Fuji flexible Pipe Mfg. Co.,Ltd. |
Jan.1961 | Fuji High-Pressure Flexible Hose Co.,Ltd established with a capital of 2 million Yen. | |
Apr.1967 | Recognized by Yokohama Rubber Co.,Ltd as a shop for manufacture of its hoses | |
Aug.1971 | The company transferred to the present location with extension of business. | |
Start of manufacture of pipe products. | Jul.1973 | Recognized by Yokohama Aeroquip Co., Ltd. as a shop for manufacture of its hoses. |
Jul.1974 | Capital increased to 48 million Yen. | |
Start of manufacture of high-pressure pipe products. | Apr.1975 | |
Addition of hose products
manufacturing facilities. | Apr.1977 | |
Introduction of CNC pipe bending machines. | Feb.1983 | |
Introduction of high fre-quency heating machines. | Apr.1983 | |
Introduction of oil-hydraulic impulse testing machines. | Dec.1984 | |
Addition of high frequency heating machines. | Apr.1987 | |
Addition of CNC pipe bend-ing machines. | Aug.1987 | |
Feb.1988 | The founder KenitsuFujii was appointed as chairman. Itsuo Fujii was appointed as president. | |
Start of large-scale manufacture of high-pressure pipe products. | Sep.1988 | |
Apr.1989 | Building of an employee’s welfare facility. | |
Nov.1990 | Addition of a machine tool factory. | |
Introduction of automatic TIG welding machines. | Mar.1991 | |
Jul.1992 | Addition of a main administrative office building. | |
Addition of oil-hydraulic impulse
testing machines.Introduction of automatic
TIG welding machines and machining tools. | Apr.1993 | |
Feb.1995 | Masaru Fujii was appointed as president. | |
Addition of CNC pipe bending machines and automatic TIG welding machines. | Sep.1995 | |
May 1996 | Provided highpressure pipe manufacturing technology for Thongchai Industries Co.,Ltd. in Thailand. | |
Addition of automatic TIG welding machines. | Jun.1996 | Recognized by Yokohama Hidex Co., Ltd. as a factory for manufacture of its pipes. |
Feb.1997 | Thongchai started joint manufacture of high-pressure pipes. | |
Addition of hose armoring blade
machines. | Mar.1997 | |
Addition of hose assembling machines. | Mar.2001 | |
Addition of NC lathes. | Jan.2003 | |
Introduction of pipe 3-D measuring machines. | Aug.2003 | |
Sep.2003 | Acquisition of the ISO 9001 certificate for quality management system. | |
Oct.2004 | Capital investment for establishment of WUXI SUITOU MACINERY CO.,LTD. in China. | |
Dec.2006 | Building of a hose assembling factory | |
Feb.2008 | Masaru Fujii was appointed as chairman. Yuuzou Fujii was appointed as president. | |
Jun.2009 | Gave Chengdu Kobelco Construction Machinery Co., Ltd. the guidance on high-pressure pipe manufacturing technology. | |
Feb.2012 | Acquisition of the ISO 14001 certificate for Environmental Management System. | |
Introduction of electrostatic painting equipment. | Oct. 2012 | |
Feb. 2013 | Occupational Health & Safety Assessment Series (OHSAS) 18001 certified. |